The client from Germany opened its store in Jawor on the planned day. About 3 months passed from the shell stage to the opening, and we carried out the installations to the client's guidelines, together with its inspector.
Scope of work
We were responsible for the electrical installations of the entire store: from the service connection, through the metering system and lighting, to the second fix. When needed, we also helped with the roof and air conditioning.
- Service connection and metering system
- Main switchboard
- Lighting of the sales floor and back-of-house areas
- Second fix
- Connection of cold rooms
- Power supply for checkouts and the POS system
- Help with the roof and air conditioning
- Cooperation with the client's inspector
Opening not postponed despite a faulty switchboard. The main switchboard chosen by the client arrived with factory defects. We spotted and corrected them during the works, even though the deadline was very tight and many crews were working on site. As a result, the client did not have to postpone the store opening.
That is the time from the shell stage to the first day of trading.
We worked to the guidelines of the client from Germany, together with its inspector on site.
The service connection, lighting, cold rooms and POS system were handled by a single contractor. When needed, we also helped with the roof and air conditioning.